Lingenfelter L250070709 Lingenfelter CTS-V LSA Supercharger Pul User Manual

Browse online or download User Manual for Pumps Lingenfelter L250070709 Lingenfelter CTS-V LSA Supercharger Pul. Lingenfelter L250070709 Lingenfelter CTS-V LSA Supercharger Pulley 2009-2012 v1.9 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 31
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Lingenfelter Performance Engineering
1557 Winchester Road
Decatur, IN 46733
(260) 724-2552
(260) 724-8761 fax
www.lingenfelter.com
Revision - 1.9
Release date: 27 February 2014
2009-2014 CTS-V Supercharger Pulley Upgrade Kit
Installation Instructions
(6.2L LSA V8 engine)
PN: L250070709
Page view 0
1 2 3 4 5 6 ... 30 31

Summary of Contents

Page 1 - PN: L250070709

Lingenfelter Performance Engineering1557 Winchester RoadDecatur, IN 46733(260) 724-2552 (260) 724-8761 faxwww.lingenfelter.comRevision - 1.9Release da

Page 2 - Parts List

Page 9. 25. Disconnect the brake booster hose from the top of the supercharger front cover.26. Disconnect the purge solenoid electrical connector fr

Page 3

Page32. Using a 10 mm socket, remove the two bolts on the bypass actuator bracket. NOTE: Do not remove the actuator at this time.10. 29. Disconne

Page 4

Page11. 35. Using an 10 mm socket, start with the back six (6) bolts and remove the sixteen (16) bolts from the supercharger cover. Refer to the bolt

Page 5

Page38. Cover the supercharger inlet with rags or plastic to prevent debris from entering the supercharger.12. 39. Using a 10 mm socket, remove the

Page 6

Page13. 41. Carefully lift up on the front of the supercharger and place a wooden block or equivalent underneath to wedge the front of the supercharg

Page 7

Page43. Using a pry bar, carefully pry the front cover in the location shown. Make certain any wires or lines are not in the way. This step may req

Page 8

Page15. 50. Notice the pulley is clamped evenly, the end is ush with the bearing rod, and the hole is drilled in the center of the end of the pulley

Page 9

Page16. 52. Secure the front cover and supercharger pulley. Using a hammer and punch, hit the two surfaces around the pin shown to the left. This w

Page 10

Page17. 56. Apply a thin lm of the supplied Permatex Ultra Black Gasket maker to the mounting surface of the front cover.57. Insert the LPE provide

Page 11

Page59. To the left shows an LPE ported supercharger front cover. The porting is provided as part of the LPE pulley installation and ECM calibration

Page 12

Page 1. Parts List # Part number Description 1 8PK1655 8 rib 1655mm belt 1 ETN307091 Pulley Cap 1 82180 Permatex Ultra Black Gasket Maker,

Page 13

Page 19. 63. (Left side of factory airbox)64. (Under side of factory airbox)65. (Right side of factory airbox)66. (Right side of factory airbox)

Page 14

Page67. Cut the airbox along your marked lines. After the nal cuts have been made, your new airbox should look like this.68. Re-install your air 

Page 15

Page 21. 71. Using a breaker bar, release the tension on the tensioner by turning it counter-clockwise. While the tension is released install the LP

Page 16

Page22. 74. Insert the bypass actuator arm into the supercharger front cover bracket. Replace the PCV hose and correct vacuum hose as shown.75. Use

Page 17

Page 23. 79. Install the boost solenoid bracket onto the bypass valve actuator. Torque the bolt down to 89 lb-in (10Nm). 80. Reconnect the vacuum

Page 18 - ) into the two (2) locations

Page24. 82. Replace the inlet air pressure electrical connector.83. Install the purge solenoid onto the front cover. Using a 10 mm socket, torque th

Page 19

Page25. 87. Replace the electrical connector to the IAT2 sensor.88. Replace the electrical connector to the BARO sensor.89. Re-connect the brake bo

Page 20 - Page 19

Page91. Replace the throttle actuator electrical connector to the throttle body.92. Install the barbed end of the supplied 45 degree plastic tting

Page 21

Page96. Loosen both band clamps and put them on both couplers. Gently work the LPE provided elbow into both couplers. Move each band clamp towards

Page 22

Page98. You can purchase vehicle programming hardware and software from LPE, you can send in your ECM for us to calibrate or you can have a local tun

Page 23

PageThe Lingenfelter CTS-V Supercharger Pulley Upgrade Kit is designed to increase the speed of the LSA Eaton TVS1900 supercharger in order to deliver

Page 24

Page 29. Table 1 - belt length and idler pulley diameters required for different LSA supercharger pulley and damper pulley combinations.Crank PulleyPN

Page 25

PageLingenfelter Performance Engineering1557 Winchester RoadDecatur, IN 46733(260) 724-2552 (260) 724-8761 faxwww.lingenfelter.comL250070709 Lingenfel

Page 26

Page3. 1. Open the hood of the vehicle. If you have been driving the vehicle, allow the vehicle to cool down for a few hours before beginning this wo

Page 27

Page 4. 5. With the strut tower brace removed, remove the back plastic cover by pulling up from either side of the intercooler.6. Remove the connect

Page 28

Page5. 11. Using a T-25 Torx tool, remove the three (3) Torx bolts from the top portion of the air lter housing. The location of the rst bolt is

Page 29

Page13. The location of the third bolt is directly behind the driver front headlight assembly.6. 14. Carefully remove the top of the air lter housi

Page 30 - Page 29

Page 7. 18. Using a 1/2” breaker bar, release the tension in the supercharger belt tensioner located on the passenger side by turning the tensioner c

Page 31

Page8. 21. Carefully remove the throttle body. Do not allow dirt or debris to enter the throttle body or front cover during the installation.22. Re

Comments to this Manuals

No comments